Plan kitchen installation as a coordinated sequence with approval points between trades. Cabinets, worktops, sink, appliances and backsplash depend on one another's finished dimensions. The exact order varies with the construction, so confirm it on the project programme before work begins.
## Resolve products and services before fabrication
Choose the appliance and sink models early enough for their installation drawings to inform the cabinets. Mark electrical, water and drainage locations with the relevant trades. Finalise the cabinet layout and material specifications before ordering parts that depend on them.
Complete necessary preparation and assess wall or floor irregularities before the joinery is fitted. The finished-floor strategy affects cabinet heights and future appliance removal. Have the designer explain how those levels are coordinated rather than assuming every trade starts from the same reference.

Use a checkpoint before worktop templating
The countertop fabricator normally needs stable, correctly positioned support and accurate openings. Ask what must be complete before measuring and who signs off the cabinet condition. Include the sink, hob and planned seam layout in that review.
Do not release a template based on dimensions that another trade intends to change. If a cabinet moves or an appliance is substituted afterward, assess the consequences before cutting the slab. Keep the approved measured drawing accessible to everyone involved in fabrication.
Finish junctions and commission the room
Coordinate worktop fitting, sink attachment, plumbing and appliance connection with the responsible installers. Backsplash setting-out should account for the actual finished surfaces and product requirements. Protect completed joinery while later trades work nearby.
At handover, test doors, drawers, appliances, lighting and service access in the completed room. Record any unfinished sealant, trim or adjustment rather than treating the presence of the main cabinets as the end of the project. Keep the final drawings and product information together for maintenance.
## A practical check before you decide
Make a programme with a named responsible person and approval condition for each handover between trades. Include cabinet readiness for templating, template approval before cutting, and service checks before closing access panels. Review the programme whenever a product or finished level changes.


Agree on three checks before the next trade starts
Before the worktop is measured, ask the cabinet fitter and fabricator to walk the run together. Open the corner drawers, check the appliance openings against the selected models and agree where the finished worktop should project. Write down who will approve the template. A drawing made before a cabinet was moved can leave a joint or cutout in the wrong place.
Before cutting, have the actual sink model, tap and mounting instructions available. Ask the fabricator and plumber to check the bowl, clips and tap position against the cabinet rails and drawer travel. Some undermount sinks need supports prepared while the cabinet is still accessible. Record the agreed detail and let the installer specify the curing time before loading the joint.
Before fitting the backsplash, check the finished counter level and mark the final positions of sockets and trim. At handover, open each door, fill and drain the sink, and inspect the connections below while water is running. Record any work left open with the name of the trade returning to finish it.
When checking a drawing, distinguish the panel thickness from the finish thickness. For example, a drawing labelled 18 mm plywood and 1 mm laminate needs a finished dimension from the cabinet maker before the fabricator templates the top. If the specification changes to 19 mm board, get the appliance opening measured again. These are example dimensions. Use the actual product schedule for your job.
Questions people ask us
Is there one sequence for every kitchen?
No. Confirm the programme for the actual construction and product instructions.
When should appliances be selected?
Early enough for their installation requirements to inform cabinetry and services.
Why check cabinets before templating?
The worktop must be measured against the support and openings that will remain in place.
What if a sink changes after templating?
Have the fabricator and other affected trades assess the change before cutting or fitting.
What marks completion?
The agreed scope should be fitted, tested, documented and reviewed with any remaining snags recorded.
Shop these categories
Keep reading
- Acrylic vs laminate for kitchen cabinets: which should you choose?
- BWP plywood vs HDHMR: which should you use for kitchen cabinets?
- How to remove fingerprints and grease from laminate cabinets
- Can you paint over laminate cabinets? Preparation and limits
- Should kitchen cabinets go all the way to the ceiling?
- Drawers vs shelves: which works better for lower kitchen cabinets?