HINCH
Guides

What cabinet and shutter clearances does an appliance garage need?

An appliance garage needs clearance for the equipment, the shutter and the person using it. Start with the opening mechanism's planning drawing and the appliances' operating instructions. A clear internal rectangle alone does not prove the completed station will work.

By Hinch team · updated 11 Nov 2026

Open countertop appliance cabinet with bifold shutter folded safely aside, plugged-out blender on tray pulled onto open counter, visible headroom and clear work

Practical guidance

An appliance garage needs clearance for the equipment, the shutter and the person using it. Start with the opening mechanism's planning drawing and the appliances' operating instructions. A clear internal rectangle alone does not prove the completed station will work.

Folded bifold cabinet doors seen from the side, showing the hinge and space around the handle.

Draw the moving envelope

Mark every position occupied by a hinged, lifting, pocket or tambour shutter. Include handles, tracks, retraction space and the neighbouring cabinet. A door that clears the counter can still hit an upper cabinet or prevent access to the adjacent drawer.

Ask whether the selected mechanism requires a prepared opening or special internal construction. Converting an ordinary cupboard after fabrication can leave compromises in its sides, bottom or appearance. Resolve these before cutting the finished panels.

Allow for operating and removal space

Measure the tallest appliance in use, not just at rest. Include a blender jar with its lid removed, the kettle's steam route and the distance needed to pull a coffee machine forward. Follow product instructions for all heat-producing equipment.

Then plan removal for maintenance. The appliance should pass through the clear opening with its handle and cable taken into account. Check whether a shelf or track obstructs the route. A carefully fitted station becomes inconvenient if replacing a basic appliance requires dismantling fixed joinery.

## Coordinate worktop, wiring and door details

Agree the relationship between the cabinet bottom, worktop surface and backsplash. Ask where crumbs or drips will collect at the threshold. Confirm whether any hardware requires fixing through the worktop and who approves that detail.

The electrician should know the opening arrangement before socket positions are finalised. Leave an identified access route for connections and controls. At handover, operate the shutter with all appliances in their planned positions and demonstrate the activity the garage was designed to support.

## A practical check before you decide

Use a full-size front elevation showing the open shutter and appliances. Mark the lid-up position of the tallest device and the route for removing it. Add the tap, nearby light and adjacent handles. Record each clearance as approved for the selected products instead of copying a universal garage dimension from a photograph.

Check an appliance through the whole movement

Measure the item with its handle, feet and any part that projects while in use. Then check how it will pass through the opening. A mixer may need to be lifted slightly to clear a lip, and an appliance with a tall lid may need a different working position from its storage position. Use the appliance instructions to settle operation and ventilation requirements instead of inferring them from a cabinet photograph.

Ask the maker to show the narrowest usable opening after the shutter system is fitted. A proposed 600 mm cabinet does not promise a 600 mm clear opening. Likewise, a drawing marked 900 mm wide does not establish the height or depth available behind the shutter. Record the finished clear dimensions and compare them with the actual item you intend to store.

Include surrounding doors and people

Open the adjacent drawer, wall-cabinet door and any nearby appliance door on the plan. Check whether the garage shutter occupies the same space or interrupts the standing position used for food preparation. Rehearse opening it with someone standing at the next counter. A mechanism that moves freely by itself may still be awkward in a busy kitchen.

Place handles and trim on the mock-up where they will actually be fitted. Their projection can change a clearance that appeared generous when only panel outlines were shown.

Keep repairs possible after installation

Ask which part of the shutter system can be removed for servicing and how the maker will reach its fixings. Check that sockets, cables and intended isolation remain accessible in the finished design. Do not approve a detail that depends on pulling an operating appliance against a trapped cable. At handover, remove and replace the largest stored appliance, test the full shutter travel and retain the product reference with the final cabinet drawing.

A blender with its lid removed on the counter beside an open appliance bay.

Questions people ask us

Can a standard cupboard be converted later?

Sometimes, but the mechanism may need different side preparation, space or support.

What is the minimum opening height?

It depends on the appliances and the shutter system. Use their actual planning requirements.

Can the shutter sit directly on the worktop?

Have the maker detail the threshold, movement and cleaning requirements for that arrangement.

Do pocket doors lose internal space?

Their retraction system occupies space that must be included in the drawing.

What should be tested before acceptance?

Opening travel, appliance operation, cable access, cleaning and equipment removal.